Runway Closures

Runway Closures

Postby Keith Smith » Mon Mar 19, 2018 8:53 am

We have decided to simulate runway closures that are 7 days longer in duration at Class Bravo and Class Charlie airports. This list will be reviewed every Monday for accuracy.

Current Runway Closures:

KGEG 7/25 (through 11/2)
KSEA 16L/34R (through 12/10)
KELP 4/22 (through 2/28/19)
Keith Smith
 
Posts: 9314
Joined: Sat Oct 09, 2010 8:38 pm
Location: Pompton Plains, NJ

Re: Runway Closures

Postby FDXDave » Tue Mar 20, 2018 2:29 am

So dumb question. But to verify the only runway we can use at ABQ right now till at least the 11th is 3/21? I like the added realism. Good idea.
Dave
FDXDave
 
Posts: 111
Joined: Mon Jul 17, 2017 7:56 pm

Re: Runway Closures

Postby Keith Smith » Tue Mar 20, 2018 5:03 am

Dave, there are 3 sets of runways, and 2 of them are closed, so logically, that leaves 3/21 :)
Keith Smith
 
Posts: 9314
Joined: Sat Oct 09, 2010 8:38 pm
Location: Pompton Plains, NJ

Re: Runway Closures

Postby RonCraighead » Thu Jul 12, 2018 11:15 pm

This will build good habits.

It was a little trap on my instrument check ride... The runways at the destination were closed after 1300, if I remember correctly.

Notams are our friend.
Ron Craighead
VFR and IFR Pilot, High Performance and Complex Endorsement (AT-6 Texan), Tailwheel Endorsement (Cessna 170), Spin Endorsement (Great Lakes) and survived some acro!
FAA Advanced Ground Instructor, Instrument Ground Instructor.
RonCraighead
 
Posts: 61
Joined: Wed Feb 04, 2015 11:23 am
Location: San Diego, CA


Return to Pilots

Who is online

Users browsing this forum: No registered users and 5 guests